This Document describes the tests performed and the Results obtained.
The Environmental Control Monitor (Software to control the ECC-Chamber)
installed on the Control PC located in the Technical Components Box.
Time |
Action |
Observation / Comments |
|
no Action until |
Performance as expected, everything OK |
9.00 h |
T decreased from 22°C to 21°C // new Chiller T = 6°C |
Swinging in nicely on T, short disturbance on RH, as
expected |
11.00 h |
T increased from 21°C to 22°C // new Chiller T = 7°C |
Swinging in nicely on T, longer bigger disturbance
on RH, as expected |
13.00 h |
T increased from 22°C to 25°C // new Chiller T = 9°C |
Swinging in nicely on T, long heavy disturbance on
RH, as expected |
15.00 h |
T decreased from 25°C to 22°C // new Chiller T = 7°C |
Swinging in nicely on T, short bigger disturbance on
RH, as expected |
|
no furter Action until |
Performance as expected, everything OK |
1)
Temperature
Chart
2)
Relative
Humidity (RH) Chart
Dew Point (DP) Chart
All these information is Copyright © IKT AG, 2008/ML ---
End of Document ---